Page 4 - Isolation-concept-web-brochure
P. 4

Isolation Room Concept
– A Turn Key Solution for hospitals

           Isolation
           room

                                               WC

                             Ante
                             room

CLEAN AIR  CONTAMINATED AIR  AIR SUPPLY            AIR EXHAUST

Air Balancing

Air balancing to be done on the VAV’s, to achieve a minimum of 2.5 Pa differential
pressure between the outside corridor (reference) and the inside of the room.

Contaminated air is cleaned through the Genano unit and exhausted out of the
building.

The only exhaust to be installed inside the room is the Genano unit.
•	 No exhaust diffusers
•	 Ceiling to be completely sealed (no tiles)
•	 Doors between the corridor and the room to be completely sealed
   1   2   3   4   5   6